[S] question in using trellis 'wireframe'

pauly@agsm.unsw.edu.au
Tue, 3 Mar 1998 10:35:39 +1000 (EET)


In persp(), we can use 'zlim' to set the z range of the plots.
How can I do the similar job in the trellis wireframe() command?
I'm using Splus 3.4 on UNIX.

Thanks in advance.
Paul Yau.
-----------------------------------------------------------------------
This message was distributed by s-news@wubios.wustl.edu. To unsubscribe
send e-mail to s-news-request@wubios.wustl.edu with the BODY of the
message: unsubscribe s-news